logo ArtiIndex

Houses with the best materials. Do not want to pay much for maintenance! then This site is for You.

 --- If you are looking for quality PVC windows, the only solution - ArtiIndex - gives you more ...
- 20 % in direct discounts!

Español English Deutsch Francais Japanese
 Find out how to improve your
 home. Request free information.
 Call...
677 33 62 80
Gandia - Valencia
   96 287 64 70

Work with us | Contact 


Questions and answers more frequent. Answers to your questions and concerns. If you need a query please do not hesitate to contact us.

FAQ - Frequently asked questions

What is the difference between a house and a Canadian conventional house.

  Construction of a house in Fitters system was different enough to respect traditional construction. The wall panels, forged, structural elements of the house are assembled on ships. Then the elements are transferred directly to the work, where we mount on the house foundation. It took the mount of the house between two and three days. The main advantage of the system is saving in time and reduced maintenance cost guarantee, heating in winter and air conditioning in summer.


How much does the Metro Square housing?

  It is impossible to calculate the price of housing per m2. Such calculations are not precise. It can confuse the promoter. Each home should be studied individually, depending on the terrain, interior finishes, type of cover, and so on. Etc.. We work with the best building materials, which gives maximum guarantees. The price of such houses is very similar to the houses built in traditional technology.

 

What is the standard of housing?

  This depends on the type of contract and the needs of the developer. The client decides which items of work are we doing, what are the items that will make other companies, or even make developer. We can only structural elements of the house, the house completely enclosed, with coatings, exterior doors, windows and cover terminate or surrender the keys in hand.

 

Timing of a dwelling.

  The first phase is to develop the project, obtain work permits. The waiting time is the same as preparing documentation independent system constructive. Getting materials and prefabricar elements in the craft-depending on the amount of housing-takes 4 to 6 weeks. The assembly on the pitch on 2-3 days and then about 4 to 10 weeks depending on the quality of internal and external finishes.


  Comprometidos con el medio ambiente.
Hasta el 100% de material reciclado.